Friday, June 28, 2013

Lean construction in the Philippines

Lean construction in the Philippines

Conventional building
Cast in situ
? Table or tunnel formwork
Prefabricated
? Composition system
? Timber
? Steel
? Cast in situ concrete
Precast
? Linear
? Skeleton
? Planar
? Planar systems
? Three dimensional box systems
? Component manufacture and sub-assembly
? Non-volumetric sub-assembly
? Volumetric pre-assembly
? Modular system
? Pre-cast concrete framing
? Panel and box systems
? Steel formwork systems
? Steel framing systems
? Prefabricated timber framing system
? Block work system
? Volumetric
? Panellized
? Hybrid
? Subassemblies and components
? Non-off-site-Modern Methods of Construction
? Pre-cast concrete-framed building
? Pre-cast concrete wall system
? Reinforced concrete building with pre-cast concrete slab
? Steel formwork system
? Steel-framed building and roof trusses

No comments:

Post a Comment